久久免费的精品国产v∧ I 亚洲国产天堂av I 性高潮免费视频 I 高清色免费 I 九九久久九九 I 性视频在线播放 I 久久av无码精品人妻系列试探 I 欧美人xxxx I 国产毛片18片毛一级特黄日韩a I 粉嫩av一区二区三区打野 I 一本加勒比波多野结衣 I 亚洲午夜av久久久精品影院 I 九草视频在线 I 97国产高清 I 97人人澡 I 一级黄色性生活大片 I 欧美成人精品三级网站 I 色综合91久久精品中文字幕 I 久久合合 I 久久伊人一区二区 I 日韩经典一区二区 I 成人1级片 I 日本语护士得到体内谢的精 I 美女有内裤下部视频 I 国内精品久久久久久无码 I 美女高潮呻吟 I 欧美aaaa性bbbbaaaa I h国产 I 亚洲专区一 I 舌头伸进去添的我好爽高潮欧美 I 久一视频在线 I 九一视频免费观看 I 把女仆吊起来揉搓双乳小说 I 中文字幕久久伊人 I 日本免费黄网 I 日本床戏视频 I 少妇熟女一区二区 I 一本大道大臿蕉视频无码 I 麻豆免费视频网站 I 国外激情av片 I 51成人免费午夜视频 I 中文字幕日韩一级 I 国产又a又黄又潮娇喘视频 I 色偷偷亚洲第一综合网 I 亚洲涩涩爱 I av在线不卡电影 I 免费看片网站91 I 久久久无码精品亚洲国产 I 性网 I 神明高肉np高h I 天天操天天摸天天干 I 老女人丨91丨九色 I 亚洲精品成人自拍 I 国产色站 I 国产精品海角社区 I 亚洲黑丝在线观看 I 日韩av理论片

News

3 reasons for inaccurate measurement of multi-function power

Release time:2018-12-08 Times of browsing:


    Multi-function smart power meters are widely used in industries, enterprises and buildings. They are mainly used to monitor the power parameters of power grids and equipment, and provide reliable evidence for the normal operation, pre-judgment and maintenance of equipment. Therefore, the accuracy of the smart power meter measurement is the basis.

    In general, the inaccurate measurement of digital power meter is like below:

    1. Problem: Three-phase voltage, three-phase current, three-phase active power, power factor and display are functional, energy measurement is inaccurate.

    Solution: If the above situation occurs, firstly check whether the inflow and outflow wiring of the three-phase current on the secondary side of the current transformer are reversed, because the current is connected from the transformer secondary side to the meter, and is divided into two ends, inflow and outflow.

    2. Problem: Three-phase voltage, three-phase current and display is normally functioning. Three-phase active power, power factor, energy metering and display is abnormal.

    Firstly check whether the inflow and outflow lines of the secondary current coming from the secondary side of the current transformer are reversed. If the current inflow and outflow are reversed, the energy is measured in EP-; if one or two phases are reversed , the active power will be offset, so the active power will be smaller, and the active elctric energy will be smaller too. At the same time, check whether the wiring phase sequence of the current transformer is misaligned. For example, the secondary side line of the phase A current transformer is connected to the Ib port of the meter, or the line of the secondary side of the phase B current transformer is connected to the Ic port of the meter and so on. Also check whether the wiring of the three-phase voltage UA UB UC UN is correct, for example, the line Ua is connected to the meter Ub, the line Ub is connected to the meter Uc, and so on.

    If there is any wrong connection, the active power display will be inaccurate, so the energy metering will be inaccurate.

    Normally, if the electric energy value is smaller, it means the active power is small. The reason for the smaller active power is that the CT ratio in the multi-function power meter is smaller than the set value. The current transformer model doesn't match the CT ratio set in meter menu.

    At the same time, the wiring of the current or voltage is wrong, and the inflow and outflow are reversed, which will cause the active power to be offset, so that the active power displayed is smaller than the actual value, resulting in a smaller electric energy measurement.

    3. If the three-phase active power display is not normal, the energy metering must be abnormal, and the pulse output is abnormal, either.

    Voltage ratio PT, PT is set to 1 when it is low voltage, if the instrument menu PT ratio isn't 1, it means the three-phase voltage display is inaccurate. When it is under high voltage 10/0.1KV, the PT voltage ratio needs to set to be 100. For CT current ratio,  If the current transformer is 100/5A, the meter menu CT ratio is set to 20.

    Typically, multi-function power meter current, voltage transformation ratio has been set up at the factory. The reason of energy metering incorrect appears is mostly because of wiring problems.
    Therefore, the multi-function meter should be checked under power failure starus before it is officially used. After a period of use, a live check should be performed.

主站蜘蛛池模板: 郴州市| 竹山县| 白河县| 凌海市| 衡水市| 永靖县| 依兰县| 新建县| 卓尼县| 双辽市| 阳原县| 东宁县| 定陶县| 孝昌县| 台前县| 永德县| 隆安县| 卫辉市| 颍上县| 安平县| 镇原县| 大冶市| 固镇县| 太谷县| 宁南县| 曲阜市| 珲春市| 松潘县| 鞍山市| 保靖县| 肇州县| 江油市| 武宁县| 三原县| 黎城县| 海伦市| 建平县| 修水县| 长兴县| 根河市| 富蕴县|